Thanks for the feedback. I searched on the Internet a few months ago and the only proposed solution I found was to bolt a metal shim below the top plinth and across the cut-out, to level the two parts and thus eliminate the sag. I did that initially, hence the six holes you can see on my deck. However then I realized that the horizontal screw across the two parts would provide less contact (and coupling) compared to the metal shim method.
Are you perhaps aware of any other method, which may be preferable?
Thanks for the feedback.




Originally Posted by rubber duck

Reply With Quote
