Originally Posted by
AJSki2fly
Hi, hope your good. I can see the end in sight now, got rid of builders a week ago and plasterer finished off kitchen, bathroom and lounge Mon to Wed last week, I relayed part of the parquet flooring in the lounge that I had to take up yesterday. We also now have all new windows.
We currently have a make do loo and shower which the plumber will remove Monday so the flooring can be laid in the bathroom, should have working loo and bath back on Tuesday. Later in the week tiling it out. We have a make shift kitchen with half old units, new ones arrive on 22 March, and we I will have help fitting.
I reckon the main rooms will be finished by early May with just the bedrooms and hallway to decorate. We can the do one at a time.
I will have the hifi up and running before then and have a few days relaxing I think.
Keep safe
Sent from my iPhone using Tapatalk
Just as long as you have a working toilet in time for my Royal visit this summer (Covid permitting)
I just dropped in, to see what condition my condition was in
T/T: Inspire Monarch, X200 tonearm, Ortofon Quintet Blue. Phono: Project Tube Box CD: Marantz CD6006 (UK Edition); Amp: Musical Fidelity A5 Integrated.
Speakers: Zu Omen Def, REL T9i subwoofer. Cables: Atlas Equator interconnects, Atlas Hyper 3.0 speaker cables
T'other system:
Echo Dot, Amptastic Mini One,Arcam A75 integrated, Celestion 5's, BK XLS-200 DF
A/V:
LG 55" OLED, Panasonic Blu Ray, Sony a/v amp, MA Radius speakers, REL Storm sub
Forget the past, it's gone. And don't worry about the future, it doesn't exist. There is only NOW.
KICKSTARTER: ENABLING SCAMMERS SINCE 2009