Not that much rush!
Consider what you really want and how it will fit into the timber surround before responding and we will agree what I can do and if it meets your needs.
Mel
Location: Hampshire
Posts: 306
I'm Mel.
Not that much rush!
Consider what you really want and how it will fit into the timber surround before responding and we will agree what I can do and if it meets your needs.
Mel
You did say ASAP!
Ok will have another think and let you know in a couple of days
At the cutting edge of Numptyness!
Many thanks to Mel who sent through the Aluminium plate with a couple of spare backs in case of numpty drilliing mishaps!
Cheers Mel !
This gives an out line of the layout including DC blocker. I'm just waiting for some silicon dampers and then I can measure up the wood.
The other pic show the leads from the valve socket which I have started to attach.
Sent from my SM-G950F using Tapatalk
At the cutting edge of Numptyness!
Not far off from completion matey.
Excellent!
Got the silicon dampers in the post today so finished the valve holder base which fits nicely. Quite surprised that my measurements all worked out lol.
Nice solid base of 4mm aluminium thanks to Mel , the revised sizing will give me lots of space in the box too.
Sent from my SM-G950F using Tapatalk
At the cutting edge of Numptyness!
Marking out back plate holes n stuff.
Sent from my SM-G950F using Tapatalk
At the cutting edge of Numptyness!