so the whole renewal process has been done in two steps,

first the structural part, as some of the screws .that fix the aluminium frame were overtight and thus wood was removed, i had to put wood spikes to redo a fresh and strong fix to avoid vibrations of the frame

then renewed the adhesive foam surround