I do need it :eek: Yes it'll be great - when it gets back together :doh:
Well i'm in the middle of my worst nightmare :eek:
This would actually be funny if it wasn't so serious :eyebrows: I need to plug all the mains cables into one of the PF40s before i carry on stuffing bits in the rack, the only problem is i don't know precisely where everything is going quite yet so i have no idea how long to make each mains lead & what socket to plug it into. That all depends on whether the equipment uses an SMPS or linear power supply :rolleyes:
Looks like a load of measuring of equipment & rack & shelves/paving slabs is in order & some close as possible guestimation :D
Now you might understand why i said i don't change things around that often :exactly:
I reckon i'll get the thing sorted by the end of the week, maybe....
E2A:- After a load of thought & lots of measurement i think i can finally move forward :) Looks like i'm actually not going to have room for one bit of kit though :rolleyes: The sacrificial cow will be the CD recorder... I'll only ever need it to record from an analogue source & i won't be doing that too often, so i'll connect a set of RCAs to the record out of the MP1 & feed them out of the rack & insulate them ready for use. Handily the Belkin PF40 has a socket on the front panel behind a cover so when i need to record anything i can plumb into that supply :)
Looks like it's all systems go, i have all the measurements i need to cut the mains cable, where everything will fit & what socket each bit of kit will need to connect to. May be operational in 4 or 5 days now as there is still a ton of work to do, but at least i know what the hell i'm doing now :cool:

