Well done Mark, mudules - non, modules - oui ;)
Printable View
Ok, Paul told me to post it publicly: Bearing and Bearing Base Plate.
:lol:
Hmm I can see a potential conflict arising here. Looking back at my post 218 it may appear that I was looking for someone to highlight Mike’s spelling mistake in which case Mark (Dingdong) would be the winner. However I was looking for someone to unravel the bearing misspelling which places Martin as the winner. He actually PM’d me with his answer so I told him to post on the tread to register his effort.
I think the fairest way to do this is to give the SR3 to Mark and give Martin the current equivalent value of the Series 2 SR3, which is £180 as a discount on an SR7 he is lusting after. :)
Hi Marco,
Just something to liven up the day for someone. I will PM Neil later when I get a break.
Ooh, cheers Paul and very generous of you. I think I'll be placing an order for an SR7-27 with you soonly :)
I'm thinking of becoming a games show host
There is always someone after your job. :)
Hi Mark,
The confusion was my fault as I should have been more precise about the requirements to win the power supply.
Neil needs the SR3 for a while for his power supply comparisons, so I have placed your prize power supply in the build schedule, then you will not have to wait too long for it and Neil can continue without rushing things. Current lead time for the SR3 is in the region of 25 to 30 working days. I should be able to ship to you mid March. PM me your shipping address so I can get my office lass dealing with the paperwork.
Regards
Paul
pm'd
Right, thats my money sent off! I should be getting these in the next 30 days or so. Cant wait!!:cool::cool::cool::cool: